National Sport Complex «OLIMPIYSKY»Ukraine, KievFor NSK «OLIMPIYSKY» reconstruction was applied vertical ROBUD STAYER formwork and horizontal ROBUD STELDECK formwork. The main stadium of European championship 2012. Украина
International «BORISPOL» Airport (Terminal F)Ukraine, KievUniversal ROBUD formwork systems are used at any objects, from small cottage to huge projects. Украина
«HILTON» hotel, Kiev, UkraineUkraine, Kiev«HILTON» hotel is not typical architecture project, with strong concrete walls and columns. ROBUD STAYER and ROBUD STELDECK formwork systems were used for the construction of it. Украина
Residential Complex «KRUSHELNITSKY»Ukraine, KievIndividual architectural project. Used formwork – ROBUD STAYER. Украина
The residential complex «GOLDEN ERA»Ukraine, OdessaApplies the vertical formwork ROBUD STAYER and horizontal formwork ROBUD STELDECK. Украина
Office buildings and villasAfrican continentAt this project walls, columns and monolithic crossbars were concreted with help of universal ROBUD STAYER elements. Другие страны
Nuclear Medicine CentreUkraine, KievUnique project, connected to radioactive rays. Thickness of monolithic walls – up to 2.7 meters, height – up to 6.0 meters. ROBUD STAYER formwork system was applied. Украина
Apartment complex «Prosveshchenija»Ukraine, Kiev. (St. Prosveshchenija)Construction - monolithic frame reinforced concrete. Formwork applied: ROBUD STAYER Украина
The residential complex «ADMIRAL»Ukraine, Kiev (pr. Glushkov)Cast-frame residential building with underground parking. ROBUD STAYER formwork was applied. Украина